Nimrod's Garbage Collector
==========================
:Author: Andreas Rumpf
:Version: |nimrodversion|
"The road to hell is paved with good intentions."
Introduction
============
This document describes how the GC works and how to tune it for
(soft) `realtime systems`:idx:.
The basic algorithm is *Deferrent Reference Counting* with cycle detection.
References on the stack are not counted for better performance (and easier C
code generation). The GC **never** scans the whole heap but it may scan the
delta-subgraph of the heap that changed since its last run.
The GC is only triggered in a memory allocation operation. It it not triggered
by some timer and does not run in a background thread.
The cycle collector can be en-/disabled independently from the other parts of
the GC with ``GC_enableMarkAndSweep`` and ``GC_disableMarkAndSweep``. The
compiler analyses the types for their possibility to build cycles, but often
it is necessary to help this analysis with the ``acyclic`` pragma (see
`acyclic <manual.html#acyclic-pragma>`_ for further information).
To force a full collection call ``GC_fullCollect``. Note that it is generally
better to let the GC do its work and not enforce a full collection.
Realtime support
================
To enable realtime support, the symbol `useRealtimeGC`:idx: needs to be
defined. With this switch the GC supports the following operations:
.. code-block:: nimrod
proc GC_setMaxPause*(MaxPauseInUs: int)
proc GC_step*(us: int, strongAdvice = false)
The unit of the parameters ``MaxPauseInUs`` and ``us`` is microseconds.
These two procs are the two modus operandi of the realtime GC:
(1) GC_SetMaxPause Mode
You can call ``GC_SetMaxPause`` at program startup and then each triggered
GC run tries to not take longer than ``MaxPause`` time. However, it is
possible (and common) that the work is nevertheless not evenly distributed
as each call to ``new`` can trigger the GC and thus take ``MaxPause``
time.
(2) GC_step Mode
This allows the GC to perform some work for up to ``us`` time. This is
useful to call in a main loop to ensure the GC can do its work. To
bind all GC activity to a ``GC_step`` call, deactivate the GC with
``GC_disable`` at program startup.
These procs provide a "best effort" realtime guarantee; in particular the
cycle collector is not aware of deadlines yet. Deactivate it to get more
predictable realtime behaviour. Tests show that a 2ms max pause
time will be met in almost all cases on modern CPUs unless the cycle collector
is triggered.
Time measurement
----------------
The GC's way of measing time uses (see ``lib/system/timers.nim`` for the
implementation):
1) ``QueryPerformanceCounter`` and ``QueryPerformanceFrequency`` on Windows.
2) ``mach_absolute_time`` on Mac OS X.
3) ``gettimeofday`` on Posix systems.
As such it supports a resolution of nano seconds internally; however the API
uses microseconds for convenience.
Define the symbol ``reportMissedDeadlines`` to make the GC output whenever it
missed a deadline. The reporting will be enhanced and supported by the API in
later versions of the collector.
Tweaking the GC
---------------
The collector checks whether there is still time left for its work after
every ``workPackage``'th iteration. This is currently set to 100 which means
that up to 100 objects are traversed and freed before it checks again. Thus
``workPackage`` affects the timing granularity and may need to be tweaked in
highly specialized environments or for older hardware.
|